Eden Re-use Waterline

The Pipeline consisted of 12,000 LF of both 8” and 10” Waterline, Air-Vac Systems, Sewer Drains, and associated Appurtenances. Half of this line was in the Asphalt and required milling and replacement for about 5,200 LF. We also ran 3,100 LF of 4” conduit with six 7’x7’ Concrete Electrical Vaults, and finished it off with a 1.25 Mile access road cut into the hillside.

Next
Next

North Canyon Trailhead